head_banner

products

One-Stop Wastewater Treatment Equipment for Metallurgical Plants

Short Description:

Liding’s containerized wastewater treatment system employs advanced IWTP technology to effectively address heavy metal, pH imbalance, and suspended solids issues in industrial wastewater. This system combines efficient sedimentation, automatic pH neutralization, and precise solid-liquid separation technologies to remove heavy metal ions, adjust wastewater pH, and separate solid pollutants. Utilizing standardized container modules, the system offers advantages such as rapid deployment, flexible mobility, and intelligent control, providing the most convenient wastewater treatment solution for the electroplating, mining, and metal processing industries.

 


Product Detail

Equipment Features

1.Long service life: The box is made of Q235 carbon steel, spraying corrosion coating, environmental corrosion resistance, life of more than 30 years.
2.High efficiency and energy saving: The core film group is lined with reinforced hollow fiber film, which has strong acid and alkali tolerance, high pollution resistance, good regeneration effect, and the erosion and energy consumption of aeration is more flat than the traditional Plate film energy saving about 40%.
3.Highly integrated: The membrane pool is separated from the aerobic tank, with the function of offline cleaning pool, and the equipment is integrated to save land space.
4.Short construction period: Civil construction only hardening the ground, the construction is simple, the period is short-ened by more than 2/3.
5.Intelligent control: PLC automatic operation, simple operation and maintenance, taking into account the offline, online cleaning control.
6.Safety disinfection: Water using UV disinfection, stronger penetration, can kill 99.9% bacteria, no residual chlorine, no secondary pollution.
7.Flexibility selection: According to different water quality, water quantity requirements, process design, selection is more accurate.

Flow Chart Of Process

JM-IWTP 流程图

Equipment Parameters

Processing capacity (m³/d)         10                20                 30                 40                 50         
Power (kW) 5  5 5 7 7
Daily Power consumption(kW/h) 50 55 70 80 90
Shipping type
  40HQ
40HQ*2  
 40HQ*3

 

                                Chromium(mg/l)           Nickel(mg/l)          Copper(mg/l)         Plumbum (mg/l)   
 Effluent       0.5 0.1 0.3 0.2

Note: The above data is for reference only. The parameters and selection are subject to mutual confirmation and can be combined for use. Other non-standard tonnage can be customized.

Application Scenarios

Rural sewage treatment projects, small town sewage treatment plants, urban and river sewage treatment, medical wastewater, hotels, service areas, resorts and other sewage treatment projects.

冶金1
冶金2
采矿1
酿酒1

  • Previous:
  • Next:

  • Write your message here and send it to us