In the environment of high temperature overseas, the Liding environmental protection installation team is working hard. The installation team relies on solid professional knowledge, and the team members accurately debug the equipment parameters. In the face of complex sewage treatment equipment installation, team members can accurately dock each pipeline and debug each set of parameters with the help of rich installation experience, precise docking of complex pipelines, and fine debugging of control system parameters, regardless of the scorching sun or high temperature and sultry. During the installation and commissioning of the equipment, the hot weather continued to be challenging, but the team was aware of the responsibility. They work together to repeatedly check the operating status of the equipment to ensure that the water treatment system can operate efficiently and stably, providing clean and safe water to the local population.




The successful promotion of the project under high temperature once again proves the strong strength and firm determination of Liding Environmental Protection Company in the field of water treatment!
Post time: Jul-03-2025